HOSPITALITY PROJECTS

Cabana Bay Resort Orlando, FL

609db5_880519edbe3a4f5f8b9b2d5eee1e7758Randall is currently working with the Lowe’s Hotel group to deliver the following services and systems:

  • Underground ductwork (under floor air)
  • Curved architecturally aesthetic AC grills
  • Accelerated project schedule
  • Hotel arrival area to be completed in 8 months
  • Full CEP
  • Cooling towers
  • Magnetic bearing chillers for patron noise compliance

PROJECT STATISTICS

Project Duration: 12 months

  • Completion Date: Phase 2: November 2013 Phase 3:May 2014
  • Project Cost: Phase 2:$7.8 million Phase 3:$3.5 million
  • Project Scope: Phase 2: Plumbing & Mechanical Phase 3: 510 rooms, pool building mechanical Package
  • Architect: Lindsey, Pope, Brafield, Clifford & Associates
  • Engineer: Lindsey, Pope, Brafield, Clifford & Associates
  • Cabana Bay Resort, Orlando, FL

Disney’s Grand Floridian Hotel – Orlando, FL

 


Westin Hotel | Tampa, FL

Randall Mechanical was responsible for all HVAC design responsibilities with exception of Bound specifications. Randall designed a 7 Story, 253 room, 4-star hotel. MEP disciplines redesigned by CHPA during construction phase. This project had a very challenging design schedule requiring rapid proactive adjustments on behalf of Randall to facilitate project completion.

CONTRACTING METHOD: Design Build
PROJECT OWNER: Starwood Hotels

PROJECT STATISTICS

  • Project Duration: 12 Months
  • Completion Date: 12/2009
  • General Contractor: BEK (now KBR)
  • Engineer of Record: CHPA



Peabody Hotel and Convention Center | Orlando, FL

Randall was responsible for load calculations, sizing and layout of piping and ductwork as well as selection and scheduling of equipment. We designed and built a 32 Story, 750 room new hotel, converted existing hotel tower cooling to municipal chilled water. The job also included laundry facilities to serve both towers (1,641 rooms) and a 1 Million square foot convention facility.

CONTRACTING METHOD: BID
PROJECT OWNER: Peabody Hotel Group

PROJECT STATISTICS

  • Project Duration: 2 Years
  • Completion Date: 10/2010
  • Project Cost: $450 Million
  • General Contractor: Balfour Beatty
  • Architect: SCA
  • Engineer of Record: CHPA